Critical Path

Critical Path Critical Path offers an exclusive, behind-the-scenes look at the engineering marvel that is the SpaceX Starship program. The documentary details the iterative design philosophy, the high-stakes testing, and the relentless drive to build the largest and most powerful rocket ever flown. From the first conceptual sketches to the atmospheric re-entry and landing attempts, this film chronicles the single, complex path of innovation required to make life multi-planetary.

Average Score : 100

The engineering journey to Starship and beyond.

Status: Released

Release Date: 2026-07-10

Geners

Production Companies

Production Countries

Run time: 34 minutes

Budget: --

Revenue: --